C10 Deconstruction Project

The C10 has been completely disassembled down to the frame.

After Pulling engine

The cleanup work on the frame is in progress. The previous owner has already notched the frame for a rear end drop and the rear suspension was moved to the inside of the frame rails.  We have been cleaning up the welds and preparing to install a full air ride system.  The tri-angulated four link will have to be installed inside of the frame rails as well.

Preping the frame

Preping the frame-2

The 454 Big Block was delivered to the machine shop to be bored and rebuilt. There will be hotter cam installed and other work done to improve the engine performance. The Turbo 400 transmission has been completely rebuilt and a 2600 RPM Stall converter installed. The engine will come back all cleaned up and running well and will have headers and other go-fast goodies.

Engine at Machine Shop

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *